Gallego Middle School: Beat a target 5% leakage rate at a quarter of the price of replacing old ductwork

During the floor-to-ceiling renovation of the Gallego Intermediate School, contractors removed the existing ceiling tiles to find ductwork that was in such bad shape, replacing the entire duct system seemed to be the only option. The building’s HVAC included 34 individual units, each with its own supply and return ducts, all made of duct board that was literally falling apart at the seams. Some of the ducts were in such disrepair that they made leakage testing impossible.